SAZEH PEYVAND CO.SHIRAZ · 29.6°N 52.5°E
EN / FAContact ↗
SAZEH PEYVAND — INDUSTRIAL ENGINEERING

Engineering the
industrial backbone

Design, fabrication, procurement and installation — delivered along one continuous path, from concept to commissioning.

SCROLL
01

From concept to commissioning

One integrated team carries every project forward — engineering, steel fabrication, supply and on-site execution, without the gaps that slow industry down.

02

Steel that carries industry

Industrial and structural steelwork — heavy frames, skeletons and equipment fabricated to tight tolerances with full quality control at every stage.

03

The machinery of production

Material handling, crushing and storage systems, dust collectors and industrial machinery — the moving parts that keep production lines alive.

04

Cleaner water, lighter footprint

Hybrid cooling, filtration and desalination systems — engineered for efficient resource use and a measurably smaller environmental footprint.

05

Renewable power, engineered

Solar and wind power plants built end-to-end — from foundations, tracking and structures to grid connection. Clean energy that scales with industry.

Built for industrial-grade delivery,
beyond fragmented contracting.

Design & Engineering

Process, mechanical and piping design with specialist software and international standards — modelled in 3D and simulated for real operating conditions.

Fabrication

Steel structures and heavy equipment produced in-house, with quality control welded into every stage of the line.

Procurement

Sourcing and supply of equipment and materials — coordinated to keep schedules and budgets intact.

Installation & Commissioning

On-site assembly, installation and start-up — handing over plants that run from day one.

FOUR CORE SECTORS

What we design, build
and commission.

01Civil & StructureIndustrial & building structuresSteel-mill halls, an 80 m process tower, space frames and solar structures — over 27,000 t of industrial steel erected.15 projectsView sector
Industrial & building structures
Industrial & building structures
Shiraz Municipality Central Building
Shiraz Municipality Central Building
Afarinesh Towers
Afarinesh Towers
GE Tower
GE TowerGraphite Electrode Raw Material Preparation Tower · Structure Height: 80 Meters · Steel Structure Weight: 2,200 Tons
Batching Room
Batching RoomYear: 1397 (2018–2019) · Pelletizing Batching Unit · Design, Manufacturing, and Installation · Structural Weight: 1,500 Tons
Balling Room
Balling RoomYear: 1398 (2019–2020) · Pelletizing Balling Unit · Design, Manufacturing, and Installation · Structural Weight: 2,000 Tons
TG & Heat Recovery & ESP
TG & Heat Recovery & ESPPelletizing Unit Auxiliary Structures · Design, Manufacturing, and Installation · Structural Weight: 1,500 Tons · Year: 1398–1399 (2019–2021)
Rolling Mill ( SBQ & Wire Line )
Rolling Mill ( SBQ & Wire Line )Rolling Mill Halls (Wire & SBQ) · Design, Manufacturing, and Installation · Structural Weight: 8,000 Tons · Year: 1399–1401 (2020–2023)
Melt Shop Extension
Melt Shop ExtensionYear: 1401 (2022–2023) · Melting and Casting Hall Expansion · Manufacturing and Installation · Structural Weight: 2,000 Tons
Seamless Pipe Structure
Seamless Pipe StructureSeamless Pipe Halls · Design, Manufacturing, and Installation · Structural Weight: 6,000 Tons · Year: 1401–1403 (2022–2025)
Post Treatment Structure
Post Treatment StructureYear: 1402 (2023–2024) · Post-Treatment Halls · Design, Manufacturing, and Installation · Structural Weight: 2,000 Tons
GR Structute
GR StructuteYear: 1400 (2021–2022) · Graphitization Hall – Electrodes · Structural Weight: 1,200 Tons
Silicon Metal Plant
Silicon Metal PlantSilicon Metal Melting and Casting Hall · Storage and WTP Halls · Cooler and Dust Collection Structures · Structural and Equipment Weight: 1,200 Tons · Year: 1400–1401 (2021–2023)
Top o Tor Sports Hall
Top o Tor Sports Hall
Space Frame Production Hall
Space Frame Production Hall
10 MW Eqlid Power Plant
10 MW Eqlid Power Plant
02Equipment & MachineryHandling, crushing, dedusting & heavy machinesConveyors up to 430 t/h, crushers, storage bins and silos, dust collection and heavy-duty machines for steel and petrochemical plants.16 projectsView sector
Handling, crushing, dedusting & heavy machines
Handling, crushing, dedusting & heavy machines
Silicon Processing Plant Batching Unit
Silicon Processing Plant Batching UnitCapacity: 100 Tons per Hour · System Components: · Feeding Hopper · Belt Feeder · Slide Gate · Belt Conveyor
Direct Reduction Plant Material Handling System
Direct Reduction Plant Material Handling SystemCapacity: 430 Tons per Hour · Total Conveyor Line Length: 1,000 Meters · Material Handling System: Belt Conveyor
Bulk Urea Handling Unit
Bulk Urea Handling UnitCapacity: 400 Tons per Hour · System Components: · Belt Conveyor · Chute · Slide Gate · Feeding Hopper
Bulk Urea Conveying Unit
Bulk Urea Conveying UnitMaterial: AISI 304 · Type: Lump Breaker · Capacity: 400 Tons per Hour · Material Processed: Urea · Output Particle Size: 8–10 mm
Silicon Processing Plant Ore Washing Unit
Silicon Processing Plant Ore Washing UnitType: Scrubber · Capacity: 20 Tons per Hour · Input Material: Silicate Ores
Silicon Processing Plant Batching Unit
Silicon Processing Plant Batching UnitType: Roller Crusher · Roll Type: Plain Rolls · Material Processed: Coal · Output Particle Size: 20–30 mm
Ducting and Dust Conveying System – Pelletizing Unit
Ducting and Dust Conveying System – Pelletizing UnitTotal Line Length: 1,200 Meters · System Components: · Dedusting Ducts · Expansion Joints · Dampers
Silicon Processing Plant Dust Collection Unit
Silicon Processing Plant Dust Collection UnitSystem Components: · Duct · Cyclone · Bag Filter · Expansion Joint · Damper
Dust Collection System – Coke Storage and Handling Unit
Dust Collection System – Coke Storage and Handling UnitSystem Components: · Duct · Damper · Hood
Die Handling Machine
Die Handling MachineCapacity 30 ton · Heavy Duty Machine · Tilting Machine
Column Preparation Machine
Column Preparation MachineGraphite Electrode Column Preparation · Automatic Transfer, Measurement, and Column Formation · Measurement of Electrode Diameter, Length, and Weight · 30-Meter Horizontal Movement of Preparation Table · Electrode Push Jacks with 4.3-Meter Stroke · Cabin-Equipped Hydraulic Unit with 250 Bar Pressure
Wire Rolling Line
Wire Rolling LineComplete Wire Rolling Line Modeling · Fabrication of Equipment for Furnace Inlet Section
Coke Storage and Handling Unit Tanks
Coke Storage and Handling Unit TanksNumber of Storage Bin: 19 · Capacity: 4 to 50 Cubic Meters · Stored Material: Metallurgical Coke · System Components: · Storage Bin · Silo · Hopper
Bulk Urea Handling Unit Storage Hopper
Bulk Urea Handling Unit Storage HopperCapacity: 40 Tons · Nominal Volume: 45 m³ · Stored Material: Urea
Direct Reduction Plant Storage Hopper
Direct Reduction Plant Storage HopperCapacity: 30 Tons · Nominal Volume: 15 Cubic Meters · Stored Material: Sponge Iron · Wear-Resistant Lining: Hardox 500
Pelletizing Unit Storage Tanks
Pelletizing Unit Storage TanksCapacity: 110 Tons · Nominal Volume: 60 Cubic Meters · Stored Material: Iron Pellets · Wear-Resistant Lining: Hardox 500 / UHMW
03Water & EnvironmentCooling, filtration & desalinationHybrid cooling units, self-cleaning filters and heat exchangers — up to 89% annual water saving on delivered systems.7 projectsView sector
Cooling, filtration & desalination
Cooling, filtration & desalination
Graphitization Furnace Cooling Unit
Graphitization Furnace Cooling Unit6 Cooling Units · 25 MW Heat Transfer Capacity · 2,100 Cubic Meters per Hour · 89% Annual Water Savings · Year 1402 (2023–2024)
Process Water Cooling Unit for Polyethylene Plant Reactors
Process Water Cooling Unit for Polyethylene Plant Reactors8 Cooling Units · 81 MW Heat Transfer Capacity · 2,800 Cubic Meters per Hour Circulating Water Flow Rate · 86% Annual Water Savings · Year 1403 (2024–2025)
Process Water Cooling Unit for Polyethylene Plant Reactors
Process Water Cooling Unit for Polyethylene Plant Reactors6 Cooling Units · 56 MW Capacity · 2,400 Cubic Meters per Hour Circulating Water Flow · 85% Annual Water Savings · Year 1404 (2025–2026)
Water Filtration
Water FiltrationType: Self-Cleaning Filter · Maximum Flow Rate: 500 Cubic Meters per Hour · Operating Pressure: 3 to 16 Bar · Filtration Rating: 100 Mesh · Backwash Water Volume per Flush: 50 Liters
Water Filtration
Water FiltrationType: Self-Cleaning Filter · Maximum Flow Rate: 500 Cubic Meters per Hour · Operating Pressure: 3–16 Bar · Filtration Grade: 100 Mesh · Backwash Water Volume per Flush: 50 Liters
Graphitization Hall Furnace Cooling Unit
Graphitization Hall Furnace Cooling UnitCapacity: 1,733 kW · TEMA Standard Type: AEU · Dimensions: 800 × 5,500 mm · Design Pressure: 5 Bar · Number of Passes per Shell: 4
Circulating Water Cooling Unit – CA Shop
Circulating Water Cooling Unit – CA ShopCapacity: 313 kW · TEMA Standard Type: AEU · Dimensions: 720 × 3,000 mm · Design Pressure: 5 Bar · Number of Passes per Shell: 8
04EnergyRenewable & green energiesSolar and wind power plants as EPC — over 543 MW of solar delivered across nine provinces.10 projectsView sector
Renewable & green energies
Renewable & green energies
121.6 MW Solar Power Plants, Fars Province
121.6 MW Solar Power Plants, Fars ProvinceShiraz, Jahrom, Kharameh, Fasa, Zarrin Dasht, Kavar, Beiza and Pasargad counties
86.4 MW Solar Power Plants, Bushehr Province
86.4 MW Solar Power Plants, Bushehr ProvinceBushehr, Dashti, Dashtestan, Tangestan, Deylam and Ganaveh counties
102 MW Solar Power Plants, East Azerbaijan Province
102 MW Solar Power Plants, East Azerbaijan ProvinceMaragheh, Ajab Shir, Shabestar, Marand, Bonab, Heris and Sarab counties
10 MW Solar Power Plant, Eqlid
10 MW Solar Power Plant, Eqlid10 MW · Shahr Ashoob Solar Power Plant · Tamin Kanigadakht Company
32 MW Solar Power Plants, West Azerbaijan Province
32 MW Solar Power Plants, West Azerbaijan ProvinceUrmia County: 3.2 MW · Khoy County: 12.8 MW · Mahabad County: 3.2 MW · Miandoab County: 9.6 MW · Naqadeh County: 6.4 MW
25.6 MW Solar Power Plants, Ardabil Province
25.6 MW Solar Power Plants, Ardabil ProvinceNamin and Khalkhal counties
142 MW Solar Power Plants, Golestan Province
142 MW Solar Power Plants, Golestan ProvinceGonbad-e Kavus, Aqqala, Maraveh Tappeh, Gomishan and Ramian counties
12.8 MW Solar Power Plants, Ilam Province
12.8 MW Solar Power Plants, Ilam ProvinceDehloran County: 12.8 MW
9.6 MW Solar Power Plants, Hormozgan Province
9.6 MW Solar Power Plants, Hormozgan ProvinceKish Island: 9.6 MW
1.2 MW Solar Power Plant, Mazandaran Province
1.2 MW Solar Power Plant, Mazandaran ProvinceMazandaran Province: 1.2 MW
START A PROJECT

Got something
to build? Let's
engineer it.

From first survey to a metered, energized handover — design, fabrication, procurement and installation, carried end-to-end by one accountable team.

  • 4core sectors, one path
  • 360°concept → commissioning
  • ISOinternational standards
  • SPCone integrated team
07 — NEWS

Latest from Sazeh Peyvand

01Exhibition2025 / 10 / 16

Participation in the 18th International Oil, Gas, Petrochemical & Energy Exhibition

Sazeh Peyvand took part in the 18th International Exhibition of Oil, Gas, Petrochemical and Energy — Booth 39, Hafez Hall, Fars International Exhibition, 12–15 October 2025.

Participation in the 18th International Oil, Gas, Petrochemical & Energy Exhibition — 1Participation in the 18th International Oil, Gas, Petrochemical & Energy Exhibition — 2
01 / 04 · ABOUT

The people behind
every project

More than 350 of the finest engineers, technicians and skilled workers stand with Sazeh Peyvand. With their dedication, knowledge and craft, they have always been the ones solving the hardest problems — and carrying us forward along the path of growth.

20,000m²Production space
12Production halls
350Team members
19yrsTrack record

20,000 m² under roof across two plants in the Shiraz Grand Industrial Estate (34,000 m² total). Plant 01 — 17,000 m², ~10,000 tons of heavy structures & equipment a year. Plant 02 — 3,000 m², industrial machinery & light solar-plant structures.

02 / 04 · GROUP

Subsidiary companies

Mahour Agro-Industry

Field
Day-old chick production
Capacity
35,000 chicks / day
Founded
2013

Sepehr Steel Installation

Field
Installation & commissioning of industrial units
Personnel
100
Founded
2017

Tahmin Mineral Smelting

Field
First silicon-metal complex in the Middle East
Capacity
6,000 tons / year
Founded
2019
03 / 04 · HISTORY

From a steel workshop
to an industrial group

2006

Founded — bolted steel-structure workshop, 30 staff

2010

Shiraz steel factory — 10,000 m² hall, 100 staff

2013

Mahour Agro-Industry founded as a subsidiary

2016

1,000 m² sandblasting hall added

2018

Becomes an industrial group · Sepehr Steel founded

2019

Capacity → 1,000 tons/month · 150 staff

2020

+5,000 m² fabrication & paint halls · Tahmin Smelting founded

2022

Plant No. 2 — 10,000 m² for machine building

2023

New engineering departments · Iran's first hybrid cooling

2024

Solar-structure line — 600 tons/month

04 / 04 · CAPACITY

Annual output
by activity

55,000TONSBuilding structures
1
  • 01Building structures
  • 02Hybrid cooling systems
  • 03Industrial equipment & machinery
  • 04Industrial structures
STANDARDS

Built on standards
& principle

Every drawing, weld and handover runs under certified management systems — audited by international bodies, so quality, safety and the environment are never left to chance.

How we work04

  1. 01

    Quality

    Quality control at every production stage by specialist experts, to international standards.

  2. 02

    Safety

    Safety and health upheld to protect our people and the environment from harm.

  3. 03

    Expertise

    Innovation and complex problem-solving from deep in-house knowledge and experience.

  4. 04

    Management

    A quality-management system on international standards, driving productivity and goals.

Certifications03

FAQ

Questions about
Sazeh Peyvand

Short answers about who we are, where we work and how a project starts.

01

What does Sazeh Peyvand do?

Sazeh Peyvand is an industrial engineering group based in Shiraz, Iran, that designs, fabricates, procures and installs industrial projects as one integrated team — from concept to commissioning. It works in four sectors: renewable energy, water and environment systems, industrial and building steel structures, and material-handling equipment and machinery.

02

Where are the office and the factories?

The head office is on Setarkhan Boulevard (end of Namazi Street) in Shiraz. Production runs in two plants in the Shiraz Grand Industrial Estate (Square 1, end of South Kargar), with 20,000 m² under roof on a 34,000 m² site. Visits are by appointment.

03

How long has the company been working, and how large is the team?

The company was founded in 2006 as a bolted steel-structure workshop with 30 people. It has since grown into an industrial group with more than 350 engineers, technicians and specialists, and three subsidiaries: Mahour Agro-Industry, Sepehr Steel Installation and Tahmin Mineral Smelting.

04

What is the annual production capacity?

Annual output by activity is about 70,000 t of industrial structures, 55,000 t of building structures, 8,500 t of industrial equipment and machinery, and 12 hybrid cooling units. Plant 01 alone (17,000 m²) produces around 10,000 t of heavy structures and equipment a year.

05

Which certifications does Sazeh Peyvand hold?

The company works under certified management systems: ISO 9001:2015 (quality management), ISO/TS 29001:2010 (oil, gas and petrochemical) and HSE-MS (health, safety and environment).

06

Which industries and clients has the company worked for?

Clients include the Renewable Energy Organization of Iran, Pasargad Alloy Steel, the Bafq Iron & Steel complex, Ardakan Novin Electrode, Kani Godakht Tahmin, and the Lorestan, Mahabad, Mahshahr and Pardis petrochemical complexes — across energy, steel, electrode, mining and petrochemical industries.

07

How do I start a project with Sazeh Peyvand?

Send a short brief — location, scope, capacity and timeline — through the contact page, call 071-9100 5020 or email solar@sazehpeyvand.ir. The engineering team replies within one business day. Office hours are Saturday to Wednesday 08:00–17:00 and Thursday 08:00–13:00 (Iran time).