121.6 MW Solar Power Plants, Fars Province
Solar Power PlantsShiraz, Jahrom, Kharameh, Fasa, Zarrin Dasht, Kavar, Beiza and Pasargad counties
Solar and wind power plants delivered as EPC — engineering, procurement and construction — for the Renewable Energy Organization and industrial owners across Iran.
Over 543 MW of solar power engineered, supplied and built — across nine provinces of Iran.
As EPC contractor to the Renewable Energy Organization, Sazeh Peyvand has delivered solar power plants in Golestan, Fars, East and West Azerbaijan, Bushehr, Ardabil, Ilam, Mazandaran and on Kish Island — plus the 10 MW Shahr-Ashoob plant at Eqlid for Kani Godakht Tahmin. Engineering, the steel mounting structures, procurement and installation stay with one team; wind power plants are the sector's second pillar.
Engineering, workshop fabrication, procurement and site works stay inside one team and one quality-management system — from the first calculation to final handover.

Shiraz, Jahrom, Kharameh, Fasa, Zarrin Dasht, Kavar, Beiza and Pasargad counties

Bushehr, Dashti, Dashtestan, Tangestan, Deylam and Ganaveh counties

Maragheh, Ajab Shir, Shabestar, Marand, Bonab, Heris and Sarab counties

10 MW · Shahr Ashoob Solar Power Plant · Tamin Kanigadakht Company

Urmia County: 3.2 MW · Khoy County: 12.8 MW · Mahabad County: 3.2 MW · Miandoab County: 9.6 MW · Naqadeh County: 6.4 MW

Namin and Khalkhal counties

Gonbad-e Kavus, Aqqala, Maraveh Tappeh, Gomishan and Ramian counties

Dehloran County: 12.8 MW

Kish Island: 9.6 MW

Mazandaran Province: 1.2 MW
Ten solar programmes across nine provinces — from the Persian Gulf coast to the north and north-west.
The steel that carries every array is designed and fabricated in our own workshops — tolerances and schedule stay under our control.
Design, procurement and construction answer to a single point of responsibility — no gaps between trades.
More than 543 MW of solar power plants in nine provinces, as EPC contractor for the Renewable Energy Organization: Golestan 142 MW, Fars 121.6 MW, East Azerbaijan 102 MW, Bushehr 86.4 MW, West Azerbaijan 32 MW, Ardabil 25.6 MW, Ilam 12.8 MW, Kish Island 9.6 MW and Mazandaran 1.2 MW — plus the 10 MW Shahr-Ashoob plant in Eqlid for Kani Godakht Tahmin.
Engineering (plant layout, structural and electrical design, 3D modelling to international standards), fabrication of the steel mounting structures in our own workshops, procurement of modules, inverters and balance of plant, then on-site installation, testing, commissioning and final handover — all by one team.
Yes. The steel that carries every array is designed and fabricated in the company's own plants — a dedicated solar-structure line produces about 600 t a month — so tolerances and schedule stay under one team's control.
Yes. Engineering and execution of wind power plants is the second pillar of the energy sector, alongside solar.