← ALL SECTORS
EN / FAStart a project ↗
DWG. SPC·EN·01 · REV. D
ENERGY / SOLAR PV + WIND
SOLAR EPC 543.2 MW · 10 PROJECTS · 9 PROVINCES
EPC · RENEWABLE ENERGY ORGANIZATION
01 — ENERGY

Renewable &
green energy.

Solar and wind power plants delivered as EPC — engineering, procurement and construction — for the Renewable Energy Organization and industrial owners across Iran.

543 MWsolar PV delivered
9 provinces10 solar projects
EPCdesign · supply · install
SCROLL

Over 543 MW of solar power engineered, supplied and built — across nine provinces of Iran.

As EPC contractor to the Renewable Energy Organization, Sazeh Peyvand has delivered solar power plants in Golestan, Fars, East and West Azerbaijan, Bushehr, Ardabil, Ilam, Mazandaran and on Kish Island — plus the 10 MW Shahr-Ashoob plant at Eqlid for Kani Godakht Tahmin. Engineering, the steel mounting structures, procurement and installation stay with one team; wind power plants are the sector's second pillar.

[ A ]

Solar & wind power plants

  • 01Engineering & designPlant layout, structural and electrical design and 3D modelling to international standards.
  • 02Solar mounting structuresSteel structures for the PV arrays, designed and fabricated in our own workshops.
  • 03Procurement & supplyModules, inverters and balance-of-plant equipment sourced through a qualified supply chain.
  • 04Installation & commissioningOn-site assembly, testing, start-up and final handover.
  • 05Wind power plantsEngineering and construction of wind generation — the second pillar of the energy sector.
[ B ]

Solar delivered, by province

  • 01Golestan — 142 MWGonbad-e Kavus, Aqqala, Maraveh Tappeh, Gomishan, Ramian.
  • 02Fars — 121.6 MWShiraz, Jahrom, Kharameh, Fasa, Zarrin Dasht, Kavar, Beiza, Pasargad.
  • 03East Azerbaijan — 102 MWMaragheh, Ajab Shir, Shabestar, Marand, Bonab, Heris, Sarab.
  • 04Bushehr — 86.4 MWBushehr, Dashti, Dashtestan, Tangestan, Deylam, Ganaveh.
  • 05West Azerbaijan — 32 MWUrmia, Khoy, Mahabad, Miandoab, Naqadeh.
  • 06Ardabil — 25.6 MWNamin, Khalkhal.
  • 07Ilam — 12.8 MWDehloran.
  • 08Hormozgan — 9.6 MWKish Island.
  • 09Mazandaran — 1.2 MWMazandaran Province.
  • 10Eqlid — 10 MWShahr-Ashoob solar plant for Kani Godakht Tahmin.

One team,
survey to energized.

Engineering, workshop fabrication, procurement and site works stay inside one team and one quality-management system — from the first calculation to final handover.

01
PHASE 01

Design & engineering

02
PHASE 02

Structure fabrication

03
PHASE 03

Procurement & supply

04
PHASE 04

Installation

05
PHASE 05

Commissioning & handover

SELECTED WORKS

Plants we've designed,
supplied and built.

RENEWABLE ENERGY ORGANIZATION · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)121.6 MW Solar Power Plants, Fars Province

121.6 MW Solar Power Plants, Fars Province

Solar Power Plants

Shiraz, Jahrom, Kharameh, Fasa, Zarrin Dasht, Kavar, Beiza and Pasargad counties

RENEWABLE ENERGY ORGANIZATION · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)86.4 MW Solar Power Plants, Bushehr Province

86.4 MW Solar Power Plants, Bushehr Province

Solar Power Plants

Bushehr, Dashti, Dashtestan, Tangestan, Deylam and Ganaveh counties

RENEWABLE ENERGY ORGANIZATION · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)102 MW Solar Power Plants, East Azerbaijan Province

102 MW Solar Power Plants, East Azerbaijan Province

Solar Power Plants

Maragheh, Ajab Shir, Shabestar, Marand, Bonab, Heris and Sarab counties

KANI GODAKHT TAHMIN COMPANY · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)10 MW Solar Power Plant, Eqlid

10 MW Solar Power Plant, Eqlid

Solar Power Plants

10 MW · Shahr Ashoob Solar Power Plant · Tamin Kanigadakht Company

RENEWABLE ENERGY ORGANIZATION · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)32 MW Solar Power Plants, West Azerbaijan Province

32 MW Solar Power Plants, West Azerbaijan Province

Solar Power Plants

Urmia County: 3.2 MW · Khoy County: 12.8 MW · Mahabad County: 3.2 MW · Miandoab County: 9.6 MW · Naqadeh County: 6.4 MW

RENEWABLE ENERGY ORGANIZATION · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)25.6 MW Solar Power Plants, Ardabil Province

25.6 MW Solar Power Plants, Ardabil Province

Solar Power Plants

Namin and Khalkhal counties

RENEWABLE ENERGY ORGANIZATION · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)142 MW Solar Power Plants, Golestan Province

142 MW Solar Power Plants, Golestan Province

Solar Power Plants

Gonbad-e Kavus, Aqqala, Maraveh Tappeh, Gomishan and Ramian counties

RENEWABLE ENERGY ORGANIZATION · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)12.8 MW Solar Power Plants, Ilam Province

12.8 MW Solar Power Plants, Ilam Province

Solar Power Plants

Dehloran County: 12.8 MW

RENEWABLE ENERGY ORGANIZATION · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)9.6 MW Solar Power Plants, Hormozgan Province

9.6 MW Solar Power Plants, Hormozgan Province

Solar Power Plants

Kish Island: 9.6 MW

RENEWABLE ENERGY ORGANIZATION · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)1.2 MW Solar Power Plant, Mazandaran Province

1.2 MW Solar Power Plant, Mazandaran Province

Solar Power Plants

Mazandaran Province: 1.2 MW

01543 MW delivered

Ten solar programmes across nine provinces — from the Persian Gulf coast to the north and north-west.

02In-house structures

The steel that carries every array is designed and fabricated in our own workshops — tolerances and schedule stay under our control.

03One accountable EPC team

Design, procurement and construction answer to a single point of responsibility — no gaps between trades.

FAQ

Solar & wind:
common questions

01

How much solar capacity has Sazeh Peyvand built?

More than 543 MW of solar power plants in nine provinces, as EPC contractor for the Renewable Energy Organization: Golestan 142 MW, Fars 121.6 MW, East Azerbaijan 102 MW, Bushehr 86.4 MW, West Azerbaijan 32 MW, Ardabil 25.6 MW, Ilam 12.8 MW, Kish Island 9.6 MW and Mazandaran 1.2 MW — plus the 10 MW Shahr-Ashoob plant in Eqlid for Kani Godakht Tahmin.

02

What does EPC for a solar plant include?

Engineering (plant layout, structural and electrical design, 3D modelling to international standards), fabrication of the steel mounting structures in our own workshops, procurement of modules, inverters and balance of plant, then on-site installation, testing, commissioning and final handover — all by one team.

03

Are the solar structures made in-house?

Yes. The steel that carries every array is designed and fabricated in the company's own plants — a dedicated solar-structure line produces about 600 t a month — so tolerances and schedule stay under one team's control.

04

Does Sazeh Peyvand build wind power plants too?

Yes. Engineering and execution of wind power plants is the second pillar of the energy sector, alongside solar.