← ALL SECTORS
EN / FAStart a project ↗
DWG. SPC·ST·03 · REV. D
STRUCTURES / INDUSTRIAL STEEL
ROLLING MILL HALLS 8,000 t · GE TOWER H 80 m
SPACE FRAME · DOUBLE-LAYER GRID
03 — STRUCTURES

Steel that
carries industry.

Industrial and building steel structures — steel-mill halls, process towers, space frames and solar mounting structures — designed, fabricated in our workshops and erected on site.

27,600 tindustrial steel
80 mGE process tower
4 typesindustrial · building · space · solar
SCROLL

More than 27,000 tonnes of industrial steel — designed, fabricated and erected by one team.

At Pasargad Alloy Steel we built the pelletizing batching and balling rooms, the TG, heat-recovery and ESP structures, the rolling-mill (SBQ & wire) and seamless-pipe halls, the melt-shop extension and the post-treatment halls. For Ardakan Novin Electrode we erected the 80 m GE tower and the graphitization hall, and for Kani Godakht Tahmin a complete silicon-metal plant as EPC. Building work includes the Shiraz Municipality central building and the Afarinesh Towers.

[ A ]

Industrial & building structures

  • 01Steel-mill hallsRolling-mill, melt-shop, seamless-pipe and post-treatment halls with crane runways.
  • 02Process towersTall braced towers such as the 80 m, 2,200 t GE tower.
  • 03Pelletizing plant structuresBatching and balling rooms, TG, heat-recovery and ESP structures.
  • 04Building structuresSteel frames for public and commercial buildings — Shiraz Municipality, Afarinesh Towers.
[ B ]

Space frames, solar & fabrication

  • 01Space-frame structuresDouble-layer grids for sports and production halls.
  • 02Solar structuresPV mounting structures — e.g. the 10 MW Eqlid plant.
  • 03Engineering & detailingAutoCAD, SolidWorks, ANSYS and Tekla; static and dynamic analysis to ASME, API, DIN and ISO.
  • 04Workshop fabricationCutting, forming, CNC machining and welding to AWS, EN and ASME IX.
  • 05Quality controlDimensional control, NDT and technical inspection at every stage.

One team,
drawing to erection.

Engineering, workshop fabrication, procurement and site works stay inside one team and one quality-management system — from the first calculation to final handover.

01
PHASE 01

Design & analysis

02
PHASE 02

Detailing

03
PHASE 03

Fabrication

04
PHASE 04

Coating

05
PHASE 05

Erection

06
PHASE 06

Inspection

SELECTED WORKS

Structures we've designed,
fabricated and erected.

Shiraz Municipality Central Building

Shiraz Municipality Central Building

Building Structures

Afarinesh Towers

Afarinesh Towers

Building Structures

ARDAKAN NOVIN ELECTRODE COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)GE Tower

GE Tower

Industrial Structures

Graphite Electrode Raw Material Preparation Tower · Structure Height: 80 Meters · Steel Structure Weight: 2,200 Tons

PASARGAD ALLOY STEEL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Batching Room

Batching Room

Industrial Structures

Year: 1397 (2018–2019) · Pelletizing Batching Unit · Design, Manufacturing, and Installation · Structural Weight: 1,500 Tons

PASARGAD ALLOY STEEL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Balling Room

Balling Room

Industrial Structures

Year: 1398 (2019–2020) · Pelletizing Balling Unit · Design, Manufacturing, and Installation · Structural Weight: 2,000 Tons

PASARGAD ALLOY STEEL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)TG & Heat Recovery & ESP

TG & Heat Recovery & ESP

Industrial Structures

Pelletizing Unit Auxiliary Structures · Design, Manufacturing, and Installation · Structural Weight: 1,500 Tons · Year: 1398–1399 (2019–2021)

PASARGAD ALLOY STEEL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Rolling Mill ( SBQ & Wire Line )

Rolling Mill ( SBQ & Wire Line )

Industrial Structures

Rolling Mill Halls (Wire & SBQ) · Design, Manufacturing, and Installation · Structural Weight: 8,000 Tons · Year: 1399–1401 (2020–2023)

PASARGAD ALLOY STEEL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Melt Shop Extension

Melt Shop Extension

Industrial Structures

Year: 1401 (2022–2023) · Melting and Casting Hall Expansion · Manufacturing and Installation · Structural Weight: 2,000 Tons

PASARGAD ALLOY STEEL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Seamless Pipe Structure

Seamless Pipe Structure

Industrial Structures

Seamless Pipe Halls · Design, Manufacturing, and Installation · Structural Weight: 6,000 Tons · Year: 1401–1403 (2022–2025)

PASARGAD ALLOY STEEL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Post Treatment Structure

Post Treatment Structure

Industrial Structures

Year: 1402 (2023–2024) · Post-Treatment Halls · Design, Manufacturing, and Installation · Structural Weight: 2,000 Tons

ARDAKAN NOVIN ELECTRODE COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)GR Structute

GR Structute

Industrial Structures

Year: 1400 (2021–2022) · Graphitization Hall – Electrodes · Structural Weight: 1,200 Tons

KANI GODAKHT TAHMIN COMPANY · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Silicon Metal Plant

Silicon Metal Plant

Industrial Structures

Silicon Metal Melting and Casting Hall · Storage and WTP Halls · Cooler and Dust Collection Structures · Structural and Equipment Weight: 1,200 Tons · Year: 1400–1401 (2021–2023)

Top o Tor Sports Hall

Top o Tor Sports Hall

Space Frame Structures

Space Frame Production Hall

Space Frame Production Hall

Space Frame Structures

KANI GODAKHT TAHMIN COMPANY · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)10 MW Eqlid Power Plant

10 MW Eqlid Power Plant

Solar Structures

01Heavy tonnage

Halls of up to 8,000 t and an 80 m process tower — fabricated and erected to schedule inside operating plants.

02In-house workshops

Cutting, forming, CNC machining, welding and coating under one roof — geometry and fit-up stay under our control.

03Quality & standards

Welded to AWS, EN and ASME IX and verified with dimensional control and NDT at every stage.

FAQ

Steel structures:
common questions

01

What steel structures has Sazeh Peyvand built?

More than 27,000 t of industrial steel, including the rolling-mill halls (8,000 t) and seamless-pipe halls (6,000 t) of Pasargad Alloy Steel, its melt-shop extension (2,000 t), the 80 m GE tower (2,200 t) and graphitization hall (1,200 t) at Ardakan Novin Electrode, and a silicon-metal plant (1,200 t) for Kani Godakht Tahmin. Building work includes the Shiraz Municipality headquarters and the Afarinesh towers.

02

Which types of structures do you design and fabricate?

Steel-mill halls with crane runways, tall braced process towers, pelletizing-plant structures, space frames for sports and production halls, solar mounting structures, and steel frames for public and commercial buildings.

03

Which standards and software are used?

Design and static/dynamic analysis use AutoCAD, SolidWorks, ANSYS and Tekla to ASME, API, DIN and ISO. Welding follows AWS, EN and ASME IX, with dimensional control, non-destructive testing (NDT) and technical inspection at every stage.

04

How much structural steel can the plants produce?

Annual output is about 70,000 t of industrial structures and 55,000 t of building structures, with cutting, forming, CNC machining, welding and coating under one roof.