DWG. SPC·EQ·04 · REV. D
EQUIPMENT / MATERIAL HANDLING
BELT CONVEYOR 430 t/h · L 1,000 m
STORAGE BIN 60 m³ · HARDOX 500 · CYCLONE + BAG FILTER
04 — EQUIPMENT & MACHINERY

Material handling
to heavy machines.

Material-handling systems, crushing and sorting, storage bins and silos, dust collection and heavy-duty machinery — engineered and built for steel, petrochemical and mineral plants.

430 t/hconveying capacity
1,200 mdedusting duct line
30 theavy-duty machines
SCROLL

The moving parts of a plant — conveying, crushing and storing material, and cleaning the air around it.

Sazeh Peyvand engineers and fabricates material-handling lines like the 430 t/h, 1,000 m conveyor system of a direct-reduction plant and the 400 t/h bulk-urea unit of Pardis Petrochemical; crushers, scrubbers and screens for silicon processing; 1,200 m of dedusting ducts at Bafq Iron & Steel; storage bins with Hardox lining; and heavy-duty machines such as the die-handling and column-preparation machines of Ardakan Novin Electrode.

[ A ]

Handling, crushing & storage

  • 01Materials handlingBelt conveyor · chain conveyor · belt feeder · slide gate — custom-sized for each capacity.
  • 02Crushing & sortingCrusher · lump breaker · scrubber · screen · separator — for a uniform product size.
  • 03Material storageStorage bin · tank · silo · hopper — uniform, blockage-free discharge with wear lining.
[ B ]

Dust collection & machinery

  • 01Dust collection systemsDuct · expansion joint · cyclone · bag filter · damper · densifier.
  • 02Heavy-duty machinesDie-handling and tilting machines up to 30 t; automatic column preparation.
  • 03Rolling-line equipmentFull 3D modelling of the wire rolling line and furnace-inlet equipment.

One team,
layout to running line.

Engineering, workshop fabrication, procurement and site works stay inside one team and one quality-management system — from the first calculation to final handover.

01
PHASE 01

Process & layout

02
PHASE 02

Mechanical design

03
PHASE 03

Fabrication

04
PHASE 04

Installation

05
PHASE 05

Commissioning

SELECTED WORKS

Equipment we've designed,
built and installed.

KANI GODAKHT TAHMIN COMPANY · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Silicon Processing Plant Batching Unit

Silicon Processing Plant Batching Unit

Materials Handling

Capacity: 100 Tons per Hour · System Components: · Feeding Hopper · Belt Feeder · Slide Gate · Belt Conveyor

TOLOU FOOLAD PARS COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Direct Reduction Plant Material Handling System

Direct Reduction Plant Material Handling System

Materials Handling

Capacity: 430 Tons per Hour · Total Conveyor Line Length: 1,000 Meters · Material Handling System: Belt Conveyor

PARDIS PETROCHEMICAL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Bulk Urea Handling Unit

Bulk Urea Handling Unit

Materials Handling

Capacity: 400 Tons per Hour · System Components: · Belt Conveyor · Chute · Slide Gate · Feeding Hopper

PARDIS PETROCHEMICAL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Bulk Urea Conveying Unit

Bulk Urea Conveying Unit

Crushing & Sorting

Material: AISI 304 · Type: Lump Breaker · Capacity: 400 Tons per Hour · Material Processed: Urea · Output Particle Size: 8–10 mm

KANI GODAKHT TAHMIN COMPANY · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Silicon Processing Plant Ore Washing Unit

Silicon Processing Plant Ore Washing Unit

Crushing & Sorting

Type: Scrubber · Capacity: 20 Tons per Hour · Input Material: Silicate Ores

KANI GODAKHT TAHMIN COMPANY · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Silicon Processing Plant Batching Unit

Silicon Processing Plant Batching Unit

Crushing & Sorting

Type: Roller Crusher · Roll Type: Plain Rolls · Material Processed: Coal · Output Particle Size: 20–30 mm

BAFQ IRON AND STEEL MINING & INDUSTRIAL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Ducting and Dust Conveying System – Pelletizing Unit

Ducting and Dust Conveying System – Pelletizing Unit

Dust Collection Systems

Total Line Length: 1,200 Meters · System Components: · Dedusting Ducts · Expansion Joints · Dampers

KANI GODAKHT TAHMIN COMPANY · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Silicon Processing Plant Dust Collection Unit

Silicon Processing Plant Dust Collection Unit

Dust Collection Systems

System Components: · Duct · Cyclone · Bag Filter · Expansion Joint · Damper

ARDAKAN NOVIN ELECTRODE COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Dust Collection System – Coke Storage and Handling Unit

Dust Collection System – Coke Storage and Handling Unit

Dust Collection Systems

System Components: · Duct · Damper · Hood

ARDAKAN NOVIN ELECTRODE COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Die Handling Machine

Die Handling Machine

Machinery

Capacity 30 ton · Heavy Duty Machine · Tilting Machine

ARDAKAN NOVIN ELECTRODE COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Column Preparation Machine

Column Preparation Machine

Machinery

Graphite Electrode Column Preparation · Automatic Transfer, Measurement, and Column Formation · Measurement of Electrode Diameter, Length, and Weight · 30-Meter Horizontal Movement of Preparation Table · Electrode Push Jacks with 4.3-Meter Stroke · Cabin-Equipped Hydraulic Unit with 250 Bar Pressure

PASARGAD ALLOY STEEL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Wire Rolling Line

Wire Rolling Line

Machinery

Complete Wire Rolling Line Modeling · Fabrication of Equipment for Furnace Inlet Section

ARDAKAN NOVIN ELECTRODE COMPANY · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Coke Storage and Handling Unit Tanks

Coke Storage and Handling Unit Tanks

Material Storage

Number of Storage Bin: 19 · Capacity: 4 to 50 Cubic Meters · Stored Material: Metallurgical Coke · System Components: · Storage Bin · Silo · Hopper

PARDIS PETROCHEMICAL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Bulk Urea Handling Unit Storage Hopper

Bulk Urea Handling Unit Storage Hopper

Material Storage

Capacity: 40 Tons · Nominal Volume: 45 m³ · Stored Material: Urea

TOLOU FOOLAD PARS COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Direct Reduction Plant Storage Hopper

Direct Reduction Plant Storage Hopper

Material Storage

Capacity: 30 Tons · Nominal Volume: 15 Cubic Meters · Stored Material: Sponge Iron · Wear-Resistant Lining: Hardox 500

BAFQ IRON AND STEEL MINING & INDUSTRIAL COMPLEX · ENGINEERING, PROCUREMENT, AND CONSTRUCTION (EPC)Pelletizing Unit Storage Tanks

Pelletizing Unit Storage Tanks

Material Storage

Capacity: 110 Tons · Nominal Volume: 60 Cubic Meters · Stored Material: Iron Pellets · Wear-Resistant Lining: Hardox 500 / UHMW

01Built for real duty

Robust design, wear-resistant materials like Hardox 500 and AISI 304, and capacities sized for each project.

02One team, layout to start-up

Design, manufacture, installation and commissioning answer to a single point of responsibility — no gaps between trades.

03Clean, safe plants

Dust collection that keeps the working environment clean and within environmental standards.

FAQ

Equipment & machinery:
common questions

01

Which equipment does Sazeh Peyvand design and build?

Material-handling systems (belt and chain conveyors, belt feeders, slide gates), crushing and screening equipment (crushers, lump breakers, scrubbers, screens, separators), storage bins, tanks, silos and hoppers, dust-collection systems and heavy industrial machines for steel, petrochemical and mining plants.

02

What is the largest material-handling system delivered?

A 430 t/h handling system with 1,000 m of belt conveyors for a direct-reduction unit, and a 400 t/h bulk-urea handling unit for Pardis Petrochemical. The company also built 1,200 m of dust-collection ducting at the Bafq Iron & Steel complex.

03

How is the equipment protected against wear?

Wear-prone parts use abrasion-resistant materials such as Hardox 500, UHMW liners and AISI 304 stainless steel, and every system is sized to the capacity of its project.

04

Does the company build heavy custom machines?

Yes — for example die-handling and tilting machines up to 30 t, and an automatic electrode-column preparation machine with a 4.3 m push jack and a 250-bar hydraulic unit for Ardakan Novin Electrode.